Code 15 OK-410(V)4 Handling and Stowage Group

Code 15 OK-410(V)4 Handling and Stowage Group

39 Pages · 2015 · 1.97 MB · English

1511 Automation Algorithm Test, Evaluation and Analysis Lake Shore Mining Co., Iron Mountain, MI, 1996 . General DDG-51 FLT IIA Layout.

Code 15 OK-410(V)4 Handling and Stowage Group free download


UNCLASSIFIED Code 15 OK 410(V)4 Handling and Stowage Group (H&SG) Build to Print (BTP) Hardware Contract Pre Solicitation Conference Distribution Statement A: Approved for Public Release Distribution Unlimited NUWC Division Newport Undersea Collaboration & Technology Outreach Center (UCTOC) 17 September 2015 UNCLASSIFIED Agenda  Introduction/Ground Rules  Disclaimer Statement  Anticipated Procurement Strategy  Technical Requirements & Overview  DIVNPT Competition and Small Business Goals and Metrics  Conclusion/Wrap up 2 Distribution Statement A: Approved for Public Release Distribution Unlimited UNCLASSIFIED Introduction/Ground Rules  Introduction of Participants  Intent of this Pre Solicitation Conference  Encourage competition by: » Providing technical information to provide potential offerors a better understanding of the technical requirements – For Prime and Subcontracting opportunities » Ensure all potential offerors receive, and have access to, the same information  Technical “Q&A” is encouraged  Q&A will be answered, either today or via the Federal Business Opportunities (FBO) Portal  No questions about incumbent contractor 3 Distribution Statement A: Approved for Public Release Distribution Unlimited UNCLASSIFIED Introduction/Ground Rules (Cont)  All attendees recommended to sign in (this is voluntary)  Please silence cell phones and pagers No personal recording  Q&A will be recorded, typed, and posted to the FBO Portal  The Attendees list will be posted to the FBO Portal  This briefing will be posted to the FBO Portal and the NUWCDIVNPT Electronic Reading Room:  http://wwwnavseanavymil/Home/WarfareCenters/NUWCNewport/Partner ships/BusinessPartnerships/ElectronicReadingRoomaspx  DO NOT directly contact the NUWC technical code after today all further dialogue will be accomplished via the Q&A feature on the FBO Portal  Technical requirements contained in this briefing are presented as a summary  Full/updated technical requirements will be provided in the Request for Proposal (RFP ) 4 Distribution Statement A: Approved for Public Release Distribution Unlimited UNCLASSIFIED Disclaimer Statement  Remarks today by Government officials involved in the Code 15 OK 410(V)4 H&SG requirement should not be considered a guarantee of the Government’s course of action in proceeding with the acquisition  The informational briefing shared today reflects current Government intentions and is subject to change based on a variety of circumstances The formal solicitation, when issued, is the only document that should be relied upon in determining the Government’s requirements 5 Distribution Statement A: Approved for Public Release Distribution Unlimited UNCLASSIFIED Anticipated Procurement Strategy  This is a follow on of NUWCDIVNPT Contract N66604 09 C 0015  (5) Offers received  Canadian Commercial Corporation (Incumbent)  Five (5) year Period of Performance  Base year plus 4 one year options  Full and Open Competition (Unrestricted)  Notional Quantity per FY  Contract LOE: Engineering Services 12,000 hrs – CPFF  Organizational Conflict of Interest (OCOI) Clause Applies  Clearance Level: UNCLASSIFIED 6 Distribution Statement A: Approved for Public Release Distribution Unlimited FY Buy/FY Install FY17/FY19 FY18/FY20 FY19/FY21 FY20/FY22 FY21/FY23 5Year Total SQQ 89A(V)15 New Quantities 5 6 6 5 6 28 UNCLASSIFIED Anticipated Procurement Strategy (Cont)  Other Direct Costs (ODC’s) will be less than 13% of total labor and ODC  Estimated Schedule:  RFP Release: December 2015  Proposals Due: 60 days after RFP release  Award Date: September 2016  Work Locations  100% Contractors and Subcontractors sites  Facilities  Facility Security Clearance Not Required 7 Distribution Statement A: Approved for Public Release Distribution Unlimited UNCLASSIFIED Anticipated Procurement Strategy (Cont)  Government Furnished Materials/Equipment/Information (GFM/E/I)  7950 301 3005 Rev1 CLIN 0009 Drawing Tree DDG 51 – Technical Drawing Package  Software Design Description (SDD ), ODIM Drawing 7950 306 1002 4  Software Version Description (SVD ), ODIM Drawing 7950 306 1011 0  Performance Specification for the AN/SQQ 89A(V)15 ASW Combat System Handling and Stowage Group for the Multi Function Towed Array, H&SG 08 001 Latest Revision 3, 3 June 2014  Multi Function Towed Array (MFTA) Electro/Optical Slip Ring Assembly (EOSRA) Test Specification DWG #: 8293682 Rev C 8 “The contractor must be certified under the United States/Canada Joint

------------- Read More -------------

Download code-15-ok-410-v-4-handling-and-stowage-group.pdf

Code 15 OK-410(V)4 Handling and Stowage Group related documents

DEPARTMENT of HEALTH and HUMAN - Centers for Disease Control and

507 Pages · 2008 · 6.61 MB · English

influenza, natural disasters, and terrorism, while remaining focused on the threats to health and local, tribal and territorial health network.

Immigration and Economy in the Globalization Process

236 Pages · 2002 · 1.63 MB · English

will need employees with the right skills and motivation. Switching to an active im- Finland by analyzing the development of the volume of foreign-born and foreign na- tionals and direct foreign . In the globalization trend of corporations, competition has shifted from natural re- source and expen

Interpreting sloppy stick figures by graph rectification and

14 Pages · 2001 · 822 KB · English

1 Interpreting sloppy stick figures by graph rectification and constraint-based matching. James V. Mahoney and Markus P. J. Fromherz Xerox Palo Alto Research Center

Assistance and Accountability in Externally Managed Schools

37 Pages · 2008 · 263 KB · English

Edison Schools, Inc., is the largest and most visible among a growing number of. Education Management profit EMOs were managing 521 public schools serving nearly 240,000 students across the United . educational services; and management consulting under the “Edison Alliance” flag, through 

An integrated approach to product design and process selection

48 Pages · 2011 · 2.15 MB ·

Narayan Raman .. M? < Bs% .. a geometric series given by TEMP(y) = r * TEMP(

Normal Curve Equivalents and Percentiles

1 Pages · 2009 · 385 KB · English

Title: A.1-(28)_FINAL_Percentiles_NCEs_2009-08-23 Author: Dee McMann Created Date: 10/28/2009 3:50:39 PM

Afghanistan Floods and Landslide

12 Pages · 2014 · 585 KB · English

are Health and care (mobile health teams, psychosocial support and CBHFA), Water and Sanitation (distribution of .. health teams (MHTs, including deployment of teams across regions) working closely with CBHFA volunteers, psycho When operating, they erect a tent that serves as an OPD ward.

Word-Level Language Identification and Predicting Codeswitching Points in Swahili-English ...

9 Pages · 2016 · 136 KB · English

Proceedings of the Second Workshop on Computational Approaches to Code Switching, pages 21–29,. Austin, TX, November 1, 2016. cO2016 conveys meaning (Myers-Scotton, 1993b). A model should be able to see this Solorio and Liu look at English-Spanish codeswitching in a relatively small 

ENTERPRISE, ENBRIDGE AND ANADARKO TO JOINTLY

4 Pages · 2012 · 111 KB · English

ENTERPRISE, ANADARKO, AND DCP MIDSTREAM TO JOINTLY DEVELOP NEW NGL PIPELINE TO SERVE COLORADO'S DENVER-JULESBURG BASIN Houston and The Woodlands, Texas and Denver

TIX Fun Deck (Group Area) Swinging pirate ship with a heart

1 Pages · 2010 · 3.41 MB · English

Midway Games Midway Games Desperados Hideaway (Group Area) all n) Arcade Smoking Area ATS ATS Tick et s S w e e t Join SpongeBob SquarePants and his Bikini Bottom